jesse82nc is 540 going over or under NC 50? its hard to tell on the video, but looks like it will go under.
I also found this page of their permit applications: https://www.ncdot.gov/projects/complete-540/Pages/permit-application.aspx On page 54 of part 1, it shows 540 going on top of Jordan Rd, but 50 going over 540.
No, but we can make some educated guesses: It currently costs $3.37 to travel all 15 miles of the existed tolled portion (I measured it on the map, so I may be a little off on mileage). The section under construction now from Holly Springs to I-40 and the Clayton Bypass is about another 16 miles. So, I would expect tolls on that section to cost about the same as the first section. Somewhere in the neighborhood of $6.70 to go from I-40 in JoCo to I-40 at the Durham County line, while skipping Raleigh. Of course, by the time the road is finished, toll rates will probably have gone up a little. But that gives you a general idea...
So for those of us who are map challenged, where would I pick up the extended 540 if I live in clayton, off 42 by the hospital to go towards RTP?
You have a few options, your best bet would be to get on US70 West and pick up NC540 West at the US70, I40, NC540 mega interchange. Otherwise you could also pick up NC540 at White Oak Road or US70 Business. Then you could take either NC540 East or West to RTP.
Anyone know where on the DOT's web site I can find the rendering for hwy 70 becoming I-42? https://www.wral.com/proposed-inter...O6dxTGX9EGJZ4ov-nfWGmUtseqAPeTAh4AyQleK3EpzPU
its basically just a name change, Havelock and Kinston by pass being about what's left to compete. Remove a few stops lights here and there.
NC DOT's US 70 Corridor program has a list of all the projects (to-date, and future), including info abou tthe I-42 designation from May. See https://www.ncdot.gov/projects/us-70-corridor/Pages/default.aspx
jesse 82nc have you seen any website to view aerial pictures on 540 under construction. You can see what's going on when you cross it on I 40, NC 50, Saul Rd at the one end and Sunset Lake Rd at the other, but wondered about areas in between to track progress. (Or anyone else).
I haven't, but I have thought of taking my drone out and taking some photos or videos. Maybe with the nice weather I can spend some time doing that next weekend.
https://www.ncdot.gov/projects/complete-540/Pages/planned-construction-activities.aspx this give basic planned activities for the next month.
One thing that has confused me so far. At I-40, just south of the US70 onramps, they have constructed the start to 3 different overpasses. But the comstruction drawings on the NC DOT page only show 2 overpasses.
yes I've looked at that too. wondered if one was a temp ramp/bridge, but it has the flower logo, and i don't think it would do that for a temp bridge. .
Actually, there are FOUR. One is immediately south of the current flyover ramp going from I-40 East to US-70 East. Then several hundred feet down the road are three more in quick succession.
I spoke with the PE in charge, and he said that the plans for the roadway changed from the most recent drawings posted online. So they are not accurate any more. I asked if the current drawings are available, but he has not responded yet.
Jesse82nc I was on the beltline today at wade ave. Lots going on there. Do you have one of those pictures for that intersection? They are far enough along with bridge columns I think i know what the plan is, but id like to see that if you can find it.
https://www.ncdot.gov/projects/i-44.../pre-construction-map-4-hillsborough-wade.pdf That's 12 lanes across on the left side for reference, including the ramps.